Taihan has completed the construction of its Submarine Cable Plant 1 in Dangjin, Chungcheongnam-do, establishing production capabilities for a wide range of submarine cables, including inter-array, export, and dynamic cables.
Taihan is also constructing Submarine Cable Plant 2 on a site directly adjacent to Plant 1, with completion scheduled for 2027. The new plant will be equipped to manufacture 640kV HVDC and 400kV HVAC submarine cables and will feature a 187-meter Vertical Continuous Vulcanization (VCV) tower, the tallest of its kind in Korea.
Upon completion of Plant 2, Taihan will establish a comprehensive supply base for submarine cable solutions covering the full spectrum of offshore wind projects, further strengthening its position as a major supplier in the global submarine cable market.
Submarine Cable Plants
Dangjin Submarine Cable Plant 1
- Completion June 2025 (Operations began in June 2024)
- Area 44,800㎡
-
Main Products
Inter-array Cable (~154kV)
Export Cable (~400kV)
Dangjin Submarine Cable Plant 2
- Completion Planned Completion in 2027 (Construction in September 2025)
- Area 214,713㎡
-
Main Products
Export Cable (~400kV)
HVDC Cable (~640kV)
Key Developments
Taihan has demonstrated its quality reliability and technological competitiveness by successively securing major projects, including the Yeonggwang Nakwol Offshore Wind Project, Anma Offshore Wind Project, and a grid interconnection project for the Shinan solar power project in Jeollanam-do.
Taihan is also continuously strengthening its R&D capabilities to enhance product safety and performance. These efforts include the transfer of technology for the Flexible Riser Installation System, a new submarine cable installation method developed by the Korea Electrotechnology Research Institute (KERI), as well as collaboration with Myongji University on the structural performance verification of submarine cables.

Taihan owns both cable-laying vessels (CLVs) for offshore wind projects introduced into Korea, establishing the country’s only CLV fleet.
With the Skandi Connector and PALOS, Taihan is strengthening its submarine cable installation capabilities. The company has further enhanced its expertise and project execution capabilities by incorporating Taihan Ocean Works, a specialized submarine cable installation company, as a subsidiary.
This enables Taihan to provide total solutions across the entire submarine cable value chain, from design and manufacturing to transportation and installation.
In response to the shortage of cable-laying vessels amid growing global demand for submarine cables, Taihan is also expanding into the vessel chartering business
to create new business opportunities.
Dual CLV Fleet

Skandi Connector
- TypeCLV(Cable Laying Vessel)
- Gross TonnageApprox. 11,000 tons
- Cable Loading CapacityUp to 7,000 tons
- Key Features- Equipped with high-specification cable installation equipment, including a large-capacity carousel and tensioner
- Capable of beaching operations, making it well suited for Korean coastal waters, including the West Coast, where waters are shallow and currents are strong

PALOS
- TypeCLV(Cable Laying Vessel)
- Gross TonnageApprox. 5,551 tons
- Cable Loading CapacityUp to 4,400 tons
- Key Features- Equipped with high-specification cable installation equipment, including a large-capacity carousel and tensioner
- Capable of beaching operations, making it well suited for Korean coastal waters, including the West Coast, where waters are shallow and currents are strong
Taihan Ocean Works

In July 2025, Taihan incorporated Taihan Ocean Works, a company specializing in submarine cable installation and engineering, as a subsidiary.
Leveraging its specialized expertise and extensive project experience in submarine cable installation, Taihan Ocean Works operates Korea’s only CLV fleet. Through this capability, Taihan continues to strengthen its submarine cable installation capabilities and enhance its competitiveness in providing total solutions.
Key Developments



Taihan has demonstrated its submarine cable installation capabilities by successfully laying the inter-array and export cables for the Yeonggwang Nakwol Offshore Wind Project, as well as 154kV extra-high-voltage submarine cables for the grid connection of a solar power project in Sinan, Jeollanam-do.
Through the successful execution of diverse projects ranging from offshore wind farms to grid connections for large-scale solar power generation, Taihan has continued to build extensive installation experience across varying marine conditions and project requirements.
Building on this track record, its own fleet of cable-laying vessels (CLVs), and specialized submarine cable installation capabilities, Taihan has established a turnkey execution system covering the entire project scope, from cable supply and transportation to laying and installation.
Through these capabilities, Taihan continues to strengthen its competitiveness as a total submarine cable solutions provider capable of delivering integrated solutions across the entire project lifecycle.